Seeing the computation tensor.

Mendeleev's table is one face of an 8-dimensional object. The same is true for computation. Every operation lives in a six-axis coordinate space — family, abstraction, thermodynamic cost, concurrency, state, information topology — and what looks like a flat table from one direction is a tensor when you rotate it. This page is the instrument. Drag, click, slide, project. The data below is the same set of 258 primitives contracted in different directions to show you what the linear list hides.

258
Primitives
33
Families
36
L₀ Free
29
Have Silicon
229
Hardware Gaps
297 composition edges
26 Bennett decompositions
20 thermodynamic inheritance edges

five projections · live tensor data from the Periodic Stack of Computation v2 · canonical reference as of 2026-04-08

The familiar projection.

Thirty-three rows. Each row is one algebraic family. Each cell is one irreducible operation. Color encodes thermodynamic floor — green is free, amber is the Landauer cost, red is hot. Cells with a thin amber border are operations that already have shipping silicon; the rest are gaps. Click any cell to read out everything the table hides.

L₀ free / bijective
L₁ measurement / generative
L₂ Landauer erasure
L₂max maximally reductive
has shipping silicon
FOUND
Foundational algebra
FF
Finite fields
LA
Linear algebra
TR
Transforms
NL
Nonlinear
PROB
Probabilistic
MEM
Memory & relations
SR
Semirings
CODE
Coding
OPT
Optimization
SYM
Symmetry
HD
Hyperdimensional
TEN
Tensor & quantum
NEURO
Neuromorphic
ANALOG
Analog & physical
STOCH
Stochastic chemistry
FRONT
Formal frontier
CALC
Calculus / analysis
STAT
Statistical inference
COMB
Combinatorial
STPROC
Stochastic processes
NT
Number theory
GEOM
Computational geometry
GAME
Game theory
LANG
Formal languages
TYPE
Type theory
CAT
Category theory
TOPO
Topological
DIFFGEO
Differential geometry
ALGGEOM
Algebraic geometry
PHYSMATH
Mathematical physics
DYNSYS
Dynamical systems
MEAS
Measure theory

The 528-cell tensor face.

Project the stack onto the three purely-mathematical axes — family, state topology, information topology — and you get a 528-cell coordinate space (33 × 4 × 4). Only about a quarter of the cells are occupied. The empty cells with occupied neighbors are predictions: positions where the structure of the stack says an operation should exist, the way Mendeleev's empty cells predicted gallium and germanium. This is the highest-leverage face of the instrument — every empty neighbor is a research target.

↔
st
↔
fi
↔
ac
↔
fb
↘
st
↘
fi
↘
ac
↘
fb
↔
st
↔
fi
↔
ac
↔
fb
↗
st
↗
fi
↗
ac
↗
fb
FOUND
FF
LA
TR
NL
PROB
MEM
SR
CODE
OPT
SYM
HD
TEN
NEURO
ANALOG
STOCH
FRONT
CALC
STAT
COMB
STPROC
NT
GEOM
GAME
LANG
TYPE
CAT
TOPO
DIFFGEO
ALGGEOM
PHYSMATH
DYNSYS
MEAS
empty (prediction)
1 primitive
2+ primitives
contains L₀ free op
Columns: 4 information topologies × 4 state topologies. Info: ↔ bijective · ↘ reductive · ↔ transformative · ↗ generative. State: stateless / finite / accumulating / feedback. All 258 primitives are now projected onto this face — the v1 axes come from the canonical periodic_stack_data.json, Waves 7–8 come from explicit math-doc tables, and Waves 1–6 use per-primitive (E, F) overrides curated in scripts/ef_overrides.py. Empty cells with occupied neighbors are predictions — Mendeleev gaps where the structure says an operation should exist but none has been named.

The thermodynamic surface.

Rotate this. Two horizontal axes: family (33) and thermodynamic class (L₀ … L₂max). The vertical axis is the count of primitives at that coordinate. Tall amber peaks are the workhorse families that have absorbed most of the stack — TR, FF, OPT, CALC. The green peaks are the L₀ free operations; the orange ones are the maximally-reductive Landauer hot zones. The flat plain is where the next generation of silicon will be built.

↔ family (33)
↕ thermo class
↑ primitive count
drag · scroll · click reset

Project the tensor.

Pick which axes to keep and which to integrate out. Every contraction reveals different structure. "Family × thermo cost" tells you which families have the most free ops. "Family × hardware status" tells you which families the silicon industry has ignored. "Concurrency × thermo cost" tells you the systolic vs sequential trade-off. Pick a projection, see live counts.

The leverage leaderboard.

Not all 229 hardware gaps are equal. Some sub-operations sit at the base of the dependency tree — build them and you unlock many downstream operations at once. Others concentrate the most algorithmic work into a single datapath. The leaderboard below ranks both views and highlights the L₀ free ops with the highest energy-savings multiplier.

MOST DEPENDED-ON — silicon investment here has the highest leverage
1
20
HW
2
18
HW
3
17
HW
4
12
HW
5
11
HW
6
11
GAP
7
11
GAP
8
11
GAP
9
10
GAP
10
9
HW
11
9
HW L₀
12
8
GAP
13
7
GAP
14
7
GAP
15
6
HW
L₀ FREE OPS BY LEVERAGE — thermodynamically free, highest energy-savings multiplier
1
9
HW
2
3
GAP
3
2
HW
4
2
HW
5
2
GAP
6
2
GAP
7
1
HW
8
1
GAP
9
1
HW
10
1
GAP
11
1
GAP
12
1
GAP
13
1
HW
14
1
GAP
MOST COMPOSITE — most algorithmic work concentrated in one chip
1
3
HW
2
3
GAP
3
3
HW
4
3
GAP
5
3
GAP
6
3
GAP
7
3
GAP
8
2
GAP
9
2
GAP
10
2
HW
THE TAKEAWAY

The three most depended-on operations (#18 matmul, #21 reduction, #4 FMA) already have shipping silicon. That's why the entire industry converges on them. But the next four — #76 matrix decomposition (11 downstream, GAP), #94 differentiation (11 downstream, GAP), #59 symbolic rewriting (10 downstream, SW only), and #95 integration (9 downstream, GAP) — have no dedicated hardware anywhere on Earth. These are the highest-leverage silicon targets in the stack. Build them and the entire upper stack gets faster.